Received Part 5 application
File Number
2026-3200
Applicant
SLR Consulting
Location
Lot 8000 on plan 422557, Lot 8100 on plan 403473, Lot 3008 on plan 430016 and River reserve – Lot 302 on plan 47452
Application details
Image
DBCA has received an application from SLR Consulting to construct a new 340m boardwalk, over the Swan River connecting Precinct A and D at the Burswood Point Redevelopment.
A copy of the application is available to download below.
Have your say!
Community input is an important part of this process, and you’re invited to share your views on the new proposal before 26 November by:
- Completing the online survey (preferred)
- Emailing your comments and / or uploading supporting documentation to rivers.planning@dbca.wa.gov.au or
- Sending a written submission to Attn: Statutory Assessments Unit, Swan Canning Waterways Branch, Department of Biodiversity, Conservation and Attractions, 17 Dick Perry Ave, Kensington 6154.
Next steps:
- The application has been referred to relevant agencies for comments and advice. These agencies have 42 days to provide a response.
- When all responses have been considered, a draft report detailing the assessment of the project will be presented to the Swan River Trust for consideration.
- The draft report will be updated to include the Trust’s recommendation and will be uploaded to this page inviting members of the public to comment on the report within 14 days.
- All submissions will be considered by the Director General in the preparation and endorsement of the final report.
- The endorsed final report and recommendation, and all submissions received, will be sent to the Minister for the Environment for determination.
- The Minister’s determination will be uploaded to this page and the Development Application process is complete. The applicant will be responsible for meeting the requirements of the conditions of approval.
Downloads
Document
- 27.84 MB
(PDF)
Last updated 14-10-2026